August 21, 2007

  • The northwest doors from the link into the Kelly Fieldhouse can be seen through a small opening in a wall in the basement.
  • Holes have been excaveted under the original main staircase in the residence to install a stronger foundation for the new elevator shaft.
  • A new opening on the left now sits next to an original doorway on the north wall of the 2nd floor corridor. This new doorway will lead into a classroom.
  • This closeup shows the thickness of the corridor walls throughout the building.
  • Since the thick corridor walls are structural steel headers are installed over these new openings.
  • The future home of the Harron Communication Center in the southeast corner of the 2nd floor.
  • As some new doorways are opened up, others like this one on the south wall of the 3rd floor corridor must be sealed.
  • This doorway on the 3rd floor used to lead to an outdoor fire escape. This is where the new connecting link will enter the new Academic Center.
  • This large room used to be two bedrooms, an escape hallway, and a kitchen in the southeast corner of the 3rd floor.