August 31, 2007

  • A view inside the temporary plaza classrooms.
  • A view inside the temporary plaza classrooms.
  • A view inside the temporary plaza classrooms.
  • A view inside the temporary plaza classrooms.
  • A small section of the wooden floor in the Multi-Purpose Room is removed. The entire floor will eventually be removed.
  • The last remnants of the Multipurpose Room stage are almost gone. The brick wall in the back leads into the existing link.
  • The last remnants of the Multipurpose Room stage are almost gone. The steel girders above the stage will soon be cut out.
  • The last remnants of the Multipurpose Room stage are almost gone. The brick wall in the back leads into the existing link. The second floor mechanical room is now visible to the space below.
  • The ceiling in the link is removed. The roofline of the existing link will eventually be lowered so that a new second floor link can be added.