August 31, 2007

  • The condition of the plaster walls can be seen in this room on the second floor of the Residence. This room will eventually be part of the Development Office Suite.
  • Cement is pumped into the fifth floor of the Residence.
  • Cement is pumped into the fifth floor of the Residence.
  • Looking down from the roof of the residence into the space that will be the east staircase of the Academic Center.
  • Crews dig under the existing staircase of the Residence to prepare the foundation for the new elevator shaft.
  • A post from the staircase that used to run from the sacristy of the church into the basement can be seen in front of the stone foundation of the Gesu.
  • Crews dig under the existing staircase of the Residence to prepare the foundation for the new elevator shaft.