The condition of the plaster walls can be seen in this room on the second floor of the Residence. This room will eventually be part of the Development Office Suite.
Cement is pumped into the fifth floor of the Residence.
Cement is pumped into the fifth floor of the Residence.
Looking down from the roof of the residence into the space that will be the east staircase of the Academic Center.
Crews dig under the existing staircase of the Residence to prepare the foundation for the new elevator shaft.
A post from the staircase that used to run from the sacristy of the church into the basement can be seen in front of the stone foundation of the Gesu.
Crews dig under the existing staircase of the Residence to prepare the foundation for the new elevator shaft.